Payment Terms for Buying Machinery from China: T/T vs L/C Explained

For most first-time importers, the moment of highest anxiety is not choosing the machine — it is wiring the money. You have compared suppliers, confirmed the specification, negotiated the price, and now the supplier asks for a 30% deposit by telegraphic transfer, with the balance due before shipment. For a machine worth tens of thousands of dollars, that is a real commitment, and the questions come fast: Is this normal? What happens if the machine is wrong? Should I insist on a letter of credit instead? Understanding how payment terms work — and what protection each structure actually gives you — turns this from a leap of faith into a managed transaction.

The 30/70 Telegraphic Transfer: The Default for a Reason

The most common structure in the machinery trade is a 30% deposit when the contract is signed and the remaining 70% against a copy of the bill of lading, before the goods arrive. The deposit covers the supplier's raw materials and initial production; the balance is payable once the machine is finished, inspected, and loaded, when the supplier sends you copies of the shipping documents.

The logic from the supplier's side is straightforward: a custom-configured machine — your mast height, your tire type, your battery capacity — is hard to resell if a buyer walks away, so the deposit protects their production cost. The logic from your side is that you pay the larger balance only after the machine physically exists and is booked on a vessel, not before production starts.

The important nuance is what "balance before shipment" versus "balance against bill of lading copy" means for your leverage. If you pay the full balance before the machine leaves the factory, you lose your last point of influence over pre-shipment inspection and loading quality. Paying against the shipping document copy keeps a small amount of commercial pressure until the machine is on board. It is a modest protection, but it is free, and serious suppliers accept it without argument.

Letters of Credit: When the Bank Takes the Risk

A letter of credit replaces trust in the supplier with trust in documents. Your bank commits to pay the supplier when they present a precise set of documents — bill of lading, commercial invoice, packing list, certificate of origin, inspection certificate — that comply exactly with the terms you defined. The bank does not check the machine; it checks the paperwork against the checklist.

That distinction matters. A letter of credit protects you from a supplier who never ships, and from paying before there is proof of shipment. It does not protect you from a machine that ships but disappoints — the documents will be perfectly in order either way. Its real value appears in three situations: very large orders where a bank's involvement is worth the fee, first transactions with a supplier you have not yet audited, and markets where currency controls or political risk make buyers demand a neutral intermediary.

The costs are real: bank issuance and negotiation fees on both sides, days or weeks of document preparation, and the strict-compliance trap — a one-letter discrepancy between the bill of lading and the credit terms can delay payment and tie up the shipment. Many suppliers push back on letters of credit below roughly USD 50,000 in order value because the fees and paperwork outweigh the risk they cover. A pragmatic middle path many buyers use is a hybrid: a modest deposit by T/T, with the balance handled by letter of credit at sight.

Staging the Payments to Match the Risk

Payment schedules are a negotiation, and the structure should follow the risk in the project. On standard catalog machines that the supplier builds regularly, 30/70 is fair to both sides. On heavily customized orders, suppliers may ask for 40/60 or even 50/50 — reasonable when the configuration is genuinely special, but each extra point of deposit shifts risk toward you, so it should be matched by something in return: a detailed technical specification sheet signed as a contract annex, photo and video checkpoints during production, or a third-party pre-shipment inspection made a condition of the final payment.

For repeat buyers who have completed several transactions, suppliers routinely relax to 20/80 or even small credit lines. That flexibility is earned by track record, not requested at the start — and if a new supplier offers suspiciously light terms, treat it the same way you would treat suspiciously heavy terms: as a question worth asking.

Red Flags Worth Walking Away From

Payment negotiation is one of the most reliable filters for supplier quality. A few patterns should stop the deal, whatever the price: requests for payment to a personal account or to a company name that does not match the contract; a demand for 100% payment before production with no inspection condition; pressure to route the transaction outside the export contract "to save tax"; and reluctance to provide a bank account verification letter or business license. None of these are subtle. Legitimate exporters handle compliant payment structures every day, and their paperwork is clean because their business is clean.

The complementary protection is a defined pre-shipment inspection clause in the contract — your right to inspect, or to appoint an inspector, before the balance is paid. Suppliers who resist that clause after accepting the payment structure are telling you something about the last ten percent of their quality process.

Frequently Asked Questions

Q: Is a 30% deposit standard when buying a forklift or loader from China?A: Yes, 30% deposit and 70% before shipment or against the bill of lading copy is the most common structure for machinery exports. Variations of 20–50% deposits appear depending on customization level, order size, and the buyer's track record with the supplier.

Q: Should I insist on a letter of credit for my first order?A: Not necessarily. For orders under roughly USD 50,000, many suppliers decline L/C because fees and documentation overhead are disproportionate. A well-screened supplier plus a pre-shipment inspection clause often gives you more practical protection than an L/C at that order size. For larger orders or unaudited suppliers, an L/C — or a T/T deposit plus L/C balance — is worth the cost.

Q: What happens if I have paid and the machine arrives damaged?A: This is what marine cargo insurance and the Incoterms allocation are for. Clarify whether the price is FOB, CIF, or another term, who insures the cargo, and when risk transfers. Damage in transit is a claim against the insurance and carrier, not a payment-terms problem — which is exactly why the pre-shipment inspection and a complete photo record at loading matter.

Q: Can I pay by credit card, PayPal, or trade assurance platforms?A: Consumer channels protect small transactions but are not designed for machinery: card chargebacks do not cover B2B industrial goods well, and platform escrow covers only limited order values. Bank transfer or L/C against a verified corporate account remains the professional norm for equipment.


Conclusion: payment terms are not paperwork — they are the risk architecture of your purchase. Match the payment schedule to the production risk, keep the final payment tied to an inspection or a shipping document, use a letter of credit when the order size justifies it, and treat any irregularity in the payment request as the deal-breaker it usually is. Tell us your order value and destination port, and our export team will walk you through the exact payment and shipping structure we use for customers in your market — or send your questions directly through our contact page.